LAPORAN KAS PEMBANGUNAN
& RENOVASI MASJID JAMI TAUFIQUL HUDA
|
|||||
Periode:
Minggu ke 57
|
|
|
|
||
NO
|
TANGGAL
|
KETERANGAN
|
MASUK
|
KELUAR
|
SALDO
|
|
22 Mei 203
|
Saldo Awal
|
814.432.500
|
775.671.000
|
38.761.500
|
1
|
25-Mei-13
|
Penerimaan
Bpk Doddy Melalui BRI
|
2.500.000
|
|
41.261.500
|
2
|
|
Pembayaran
Kas bon Mandor bangunan
|
|
4.200.000
|
37.061.500
|
3
|
|
Pembelian
besi 8 SNI 40 btg
|
|
1.520.000
|
35.541.500
|
4
|
|
Pembelian
keni 2 1/2 m 4 bh
|
|
32.000
|
35.509.500
|
5
|
|
Pembelian
kawat beton 5 kg
|
|
85.000
|
35.424.500
|
6
|
26-Mei-12
|
Penerimaan
kotak amal Asmaul Husna
|
760.000
|
|
36.184.500
|
7
|
|
Penerimaan
Bpk Sugio
|
1.000.000
|
|
37.184.500
|
8
|
|
Penerimaan
Bpk Okman RT
|
1.000.000
|
|
38.184.500
|
9
|
28-Mei-13
|
Penerimaan
Semen TR 50 sak dari Ibu Agam
|
-
|
|
38.184.500
|
10
|
29-Mei-13
|
Pembelian
split 1 truk
|
|
1.450.000
|
36.734.500
|
11
|
|
Pembelian
besi 13o ulin 15 btg
|
|
1.680.000
|
35.054.500
|
12
|
|
Pembelian
triplek 9 mm 4 lbr
|
|
420.000
|
34.634.500
|
13
|
|
Pembelian
kawat beton 1 kg
|
|
17.000
|
34.617.500
|
14
|
30-Mei-13
|
Penerimaan
Bpk Abdurrahman
|
300.000
|
|
34.917.500
|
|
|
Saldo
Akhir Per 30 Mei 2013 =
|
819.992.500
|
785.075.000
|
34.917.500
|
Teriring do’a kami sampaikan,
semoga Bapak/Ibu sekeluarga senantiasa berada dalam limpahan Rahmat dan Karunia
Allah SWT, Tuhan Yang Maha Esa sehingga tetap dalam bimbingan dan petunjuk-Nya.
Amin.
Serta ucapan terimakasih yang
tiada terhingga, kami sampaikan kepada Yang Terhormat para Donatur yang telah
membantu dalam pelaksanaan Pembangunan
& Renovasi Masjid Jami’ Taufiqul Huda.
Hormat kami,
Panitia Pelaksana
Pembangunan & Renovasi Masjid Jami’
Taufiqul Huda.